Welcome Visitor
Today is Sunday, September 22, 2019

Take A Look At The Plans For Sea Bright's New Municipal Buildings

An overview of the locations of the two new municipal buildings.
An overhead view of the layout of the municipal complex.
The first floor of the municipal complex.
The second floor the municipal complex.
The top floor of the municipal complex.
The east and west elevations of the municipal complex.
The north and south elevations of the municipal complex.
The site plan for the beachfront pavilion, including the ramps that will lead down to the seawall and beach.
The ground floor of the beachfront pavilion.
The first floor of the beachfront pavilion.
The second floor of the beachfront pavilion.
The top floor of the beachfront pavilion.
The roof plan for the beachfront pavilion.
The north elevation of the beachfront pavilion.
The south elevation of the beachfront pavilion.
The west elevation of the beachfront pavilion.
The east elevation of the beachfront pavilion.
A cross section of the beachfront pavilion.
Another cross section of the beachfront pavilion.

SEA BRIGHT: The new designs for the borough's beachfront pavilion and municipal complex were shown to the public for the first time last week during a town hall-style meeting.

At the time of Word On The Shore's story on the meeting, the plans were not yet available in PDF form, but have since been sent to our publication.

Check out the gallery above to take a look at the plans as they were show to the public. Click on each photo to get a better look.

Click here to read our story on the town hall meeting from Nov. 30.



Share: 
Powered by Bondware
News Publishing Software

The browser you are using is outdated!

You may not be getting all you can out of your browsing experience
and may be open to security risks!

Consider upgrading to the latest version of your browser or choose on below: